Surface Water

Featured Articles
October 11, 2022 In an effort to inform the general public, especially citizen activists, policymakers, researchers, and students, about the current status of the Vrishabhavathi river, Paani.Earth has created the necessary maps, data, analysis, and information to drive conservation awareness and action around the river.
Vrishabhavathi river (Image Source: Paani.Earth)
August 9, 2022 Ensuring irrigation through farm ponds in tribal Chhattisgarh
Many tribal farmers opted for individual farm ponds under MGNREGA ensuring protective irrigation. (Image: Meenakshi Singh)
November 8, 2020 The National Hydrology Project has created a national platform for water data and is working to enhance the technical capacities of agencies dealing with water resources management.
Breakthrough cloud computing facilities and remote sensing applications have helped showthe filling pattern of a water body (tank or reservoir) through freely available satellite imagery at an interval of five days.  (Image: Maithan dam, Wikimedia Commons)
December 26, 2019 Policy matters this week
The Mandovi river disputed between Karnataka and Goa (Source: IWP Flickr Photos)
Accessing safe drinking water during floods in North Bihar
North Bihar has the distinction of having an additional season in a calendar year, clearly identified by the misery, destruction and fatality accompanying it. Posted on 13 Jun, 2011 03:23 PM

This season in the region is commonly referred to as – Barh (flood). For centuries local people have treated it as ‘a way of life’, and found ways to deal with it. Post independence, this ‘way of life’ gradually transformed into an assured annual devastation. The once self-sufficient communities in the flood plains have been relegated to being highly dependent on sources external to the village for their survival during floods.

Why Mumbai must reclaim its Mithi – A study by Observer Research Foundation
This report deals with the study on the neglect and virtual turning of the river Mithi in Mumbai into a sewer. Posted on 08 Jun, 2011 05:05 PM

The river, along with its estuarine reach, provides the much-needed green lungs to the city in the form of mangroves. Neglect of this river was the main cause of the catastrophic floods in Mumbai on 26 July, 2005, which claimed nearly 1,000 lives. In what could be a monumental urban transformation initiative to be undertaken anywhere in India yet, ORF has proposed a grand vision for the reclamation of Mithi River. The study report and a documentary film ’Making the sewer a river again - Why Mumbai must reclaim its Mithi’ on the dreadful conditions of the river, was released in May, 2011 in Mumbai.

Fluorosis in an urban slum area of Nalgonda - Andhra Pradesh - An epidemiological study - Indian Journal of Public Health
This paper describesa study undertaken in Nalgonda to explore the impact of a new water source, the water from the Nagarjunsagar dam. Posted on 07 Jun, 2011 10:09 AM

.

ADB funded hydro projects in Himachal Pradesh: Disastrous experience - Press release by Him Dhara, SANDRP and HLJM
The Asian Development Bank is financing four hydro projects under the misleading name of 'Himachal Clean Energy Development Programme'. Posted on 06 Jun, 2011 06:07 PM


South Asia Network on Dams, Rivers and PeopleReport questions ADB funded projects under the 'Himachal Clean Energy Development Programme'.

  • ADB loans for four hydroprojects at eco-fragile zones
  • Livelihood concerns and environmental issues un-addressed
  • Section 17/4 – Urgency clause being used by HPPCL for forced acquisition of land
  • Poor EIA reports and non compliance to environmental norms

Recently, a Public Hearing for the World Bank funded Luhri Hydro Electric had to be cancelled after public protests making it clear that the environmental and social impacts of Hydropower projects as well as the increasing gap between their promise and performance, especially in the Himalayan region have become issues of serious concern. And yet these projects continue to be promoted in the garb of renewable and clean energy. So much so that governments are borrowing millions of rupees from international banks and financial institutions to fund these so called 'green' projects.The four ADB financed hydro power projects being constructed by HPPCL include the 195 MW Integrated Kashang Stage I, II and III and the 402 MW Shongtong-Karccham in Kinnaur. The other two projects are the 111 MW Sawara-Kuddu hydropower projects in Shimla district and the 100 MW Sainj hydropower project in Kullu District.

Volunteering at the Vembanad fish count 2011 - An Arghyam field report
A team from Arghyam recently visited Alleppey in Kerala to participate in the Vembanad Fish Count 2011. Posted on 04 Jun, 2011 12:00 AM

 

 

Guest post by Priya Desai

Background

This was organised by the Ashoka Trust for Research in Ecology and the Environment (ATREE). Held on May 26th 2011, we were joined by around 150 to 200 student volunteers from various higher educational institutions in Kerala, such as the Kerala University of Fisheries and Ocean Studies, St. Albert's College in Ernakulam, School of Applied Life Sciences in Chuttippara and the School of Environmental Sciences, Mahatma Gandhi University.

Integrated River Basin Planning – Experience on policy and practice in Pamba River Basin in Kerala – A report by APSF Environment Project
These reports present a replicable model for river basin management of intra-state rivers in India. Posted on 30 May, 2011 09:50 PM

Pamba River BasinThe Pamba Pilot Project’s aim was to deliver “Policy Support to Integrated River Basin Management” and to contribute to the continuing EU-India policy dialogue in the water sector.

Analysis of TAC guidelines and decisions in recent meetings' - Dams, Rivers and People - Newsletter of SANDRP for April, May 2011
This newsletter focuses on analysis of the TAC guidelines and the impact of mining on rivers in Goa and Meghalaya. Posted on 27 May, 2011 01:26 PM

 

South Asia Network on Dams, Rivers and PeopleNewsletter of South Asia Network on Dams, Rivers and People (SANDRP) for April - May 2011 (Volume 9 Issue 3-4), focuses on the following topics.

  • Analysis of TAC guidelines and decisions in recent meetings
    The Advisory Committee in the Union Ministry of Water Resources for consideration of techno-economic viability of Irrigation, Flood Control and Multi Purpose Project Proposals (TAC in short) is supposed to discuss the techno-economic viability of the irrigation, flood control and multi-purpose project proposals as per the Resolution published in the Union of India Gazette Notification No. 12/5/86-P-II dated Nov 27, 1987.
Exhibition of "Dakshina Pinakini River Mapping and Landscape Survey"- An artistic intervention, 23rd - 26th May, 2011, Bengaluru
Posted on 26 May, 2011 01:23 PM

Venue: Venkatappa Art Gallery, Kasthurba road, Bengaluru

Collaborated by: Subramani J, Ravikumar S M Halli & Shivaprasad S

Description:

The study focuses on Bangalore, highlighting its important rivers, lakes and its very lavish natural resources and how it is getting damaged due to its excessive urban growth and ignorance of the people. We started our documentation from Nandi hills to Hosur was our destination. Here we filmed and photographed various aspects of this river, the agricultural landscape and the urban scape. These documentations are archival materials, which have been focused during the process of research. Like how the death of a river takes place, where it used to begin and rebirth of the river due to the excess development of Broad Bangalore’s urban area.

Interlinking of water harvesting structures through link water channels - A viable alternative at micro-level by Ambuja Cement Foundation
This report offers an account of interlinking of water harvesting structures through link water channels as a viable option of water management at micro-level. Posted on 25 May, 2011 07:39 PM

InterlinkingThe coastal areas of Gujarat especially the villages lying within 20-25 km from the seashore are suffering from the problem of salinity ingress. Most of the rivulets that drain this region like Goma and Somat are seasonal at best and their water does not last beyond monsoons. The other aquifers like ponds, which get water from these rivers, also dry up as early as October.

In the name of clean energy – A report on Asian Development Bank financed hydropower projects in Himachal Pradesh
This report deals with the ADB financed hydropower projects in Himachal Pradesh, which are leading to obstruction of the rivers and their ineffectiveness in harnessing the water energy. Posted on 25 May, 2011 07:06 PM

Him Dhara ReportThis report by Him Dhara, an environmental research and action collective, deals with the Asian Development Bank financed hydropower projects in Himachal Pradesh, which are leading to obstruction of the rivers and their consequent disappearance for harnessing energy and making ‘judicious’ use of the water. Within the hydro sector the attention has turned to the Indian Himalayan region which is estimated to have seventy nine per cent of the total hydropower potential of the country.

The technology of ‘run of the river’ (ROR) used to tap “the flow of rivers” in high gradient zones to generate power has given impetus to setting up of hydro-projects in the Himalayan states. In India, the mountainous region of the Himalayas offered the “perfect setting” for such projects, with the availability of several flowing water sources that could be tapped before they reached the plains. Of the Himalayan states, after Arunachal Pradesh, Himachal Pradesh is second in line with a hydropower potential of about 21000 MW. The installed capacity has increased twenty fold (from 326 MW to 6370 MW) in the last ten years indicating the frenzied pace of hydropower development in the state.

×