SANDRP's submission to the Kosi Inquiry Commission constituted to look into the embankment breach in 2009
Posted on 12 Mar, 2009 10:06 PMFrom,
Himanshu Thakkar
South Asia Network on Dams, Rivers & People
86-D, AD block, Shalimar Bagh, Delhi 110 088
Ph: (011) 27484655, 9968242798
cwaterp@vsnl.com, www.sandrp.in
March 10, 2009
To,
Kosi Inquiry Commission,
4, Deshratna Marg,
State Guest House,
Patna-800 015.
Phone: (0612)-2215300.
E-Mail: kosi-aayog-bih@nic.in surendra2547@rediffmail.com
Subject: Issue of accountability for the breach of Kosi embankment
Dear
Kosi Inquiry Commission members, This is in response to the advertisement in the Hindustan Times dated February 26, 2009, where the Kosi Inquiry Commission had invited submissions from all concerned by March 13, 2009.
- There is no doubt that the breach of Kosi embankment on August 18, 2008 was a man made tragedy. The breach occurred because the steps necessary to be taken to ensure adequate maintenance of the embanked river portion were not taken by the concerned persons in the short and the long term.
- The Ganga Flood Control Commission (http://gfcc.bih.nic.in/) is a sub ordinate office of the Union Ministry of Water Resources. The GFCC’s Chairman’s introduction to the Annual report of the GFCC for the year 2006-07 (the latest year for which the website has the annual report) claims, “As Chairman of the Gandak High Level Committee and Kosi High Level Committee, GFCC has recommended every year, the flood protection works for implementation by the Govts of U.P and Bihar. The implementation of recommendations has successfully helped in maintaining the flood protection embankments satisfactorily thereby protecting large areas behind them.” Since GFCC chairman takes the responsibility for the “successfully… maintaining the flood protection embankments satisfactorily” for Kosi river, the responsibility for its mal functioning must be with the same chairman of the GFCC.
- The section 4.3.1 of the annual report of GFCC says, “The Kosi High Level Committee (KHLC) was constituted by the then Irrigation Dept. Govt of Bihar in the year 1978 under the Chairmanship of Chairman, GFCC to review/examine the protection works already taken on the river and recommend protection measures to be taken before the next flood season. Since then the committee is inspecting every year the protection works taken up on the river and is making recommendations regarding protection work to be executed on the river before the next flood season. The State Govt executes the schemes on the basis of the recommendations of the committee.” The list of members given in the annual report of the GFCC is copied below. It is clear that all those who were members of the KHLC listed above during the period October 1, 2007 (end of the 2007 monsoon season) and August 18, 2008 (the day the embankment breached) and prior periods where necessary, should be held responsible for the lack of required maintenance work done, which lead to the Kosi disaster.
- In para 5.1 of the GFCC annual report for 2006-07 it is stated, “Besides above, all schemes receiving Central Assistance under the following centrally sponsored /central sector schemes were closely monitored during the year. Maintenance of flood protection works of Kosi & Gandak Projects in Nepal portion.” The responsibility for close monitoring of the maintenance of the flood protection work of Kosi project in Nepal is, thus, clearly of GFCC and it is lack of maintenance in this area that lead to the Kosi flood disaster of 2008.
- Attached at Annexure 1 are three letters, all from Director (Coordination) of GFCC to the Engineer-in- Chief (North), Water Resources Dept, Govt of Bihar. The three letters are dated April 1, 2008, April 25, 2008 and June 12, 2008. Since the text in the letter dated April 1, 2008 is not fully legible, a file containing the retyped letter is attached as Annexure 1A. In these letters, the Director, GFCC is telling the Engineer - in - Chief (North), WRD, GoB, that: The estimates/ schemes for the maintenance of the Nepal portion of the Kosi project, as recommended by the KHLC, to be completed in Nepal before the floods of 2008 “has not yet been received in this office”. The monthly physical and financial progress reports be sent to GFCC The may be treated as “urgent”. The copies of this letter were also sent to the Chief Engineer, WRD, Govt of Bihar, Dist Supaul. What these letters convey is that GFCC had no idea about the implementation of the repair of the Kosi embankment in Nepal portion on April 1, 2008, by which time, in normal course, the work should have been completed, since the snow melt in summer increases the flow in the river Kosi. What is strange from the subsequent letters of April 25, 2008 and June 12, 2008 is that they refer to the earlier letters, they say the same thing, they say that the matter may be treated as urgent, and yet they show no evidence of any action, besides writing of these letters. In matters where lives, livelihoods, safety of crores of people is at stake, where safety of crops and property over lakhs of hectare is at stake, the officials who are statutorily authorized (we can assume that since Director GFCC was writing these letters, he was writing on behalf of GFCC and it reflected the state of minds and actions of everyone at GFCC, including its chairman) and responsible, were indulging in writing these letters and nothing else. These officials should have been taking many other urgent steps rather than limiting to writing these letters to ensure that the duty given to them is indeed fulfilled. It seems that they taken no urgent steps to fulfill their statutory responsibilities. Hence everyone at GFCC, right from chairman down to all others who are responsible in this matter are held accountable for the lack of maintenance at the Kosi embankments that lead to the breach. The fact that the Engineer-in-Chief, WRD, GoB in Patna and the Chief Engineer at Supaul did not respond to these letters (as seems to the case from the series of unanswered letters) mean that they both and also the lower officials should be held accountable for this disaster. This in turn also fixes the responsibility of all the members of KHLC since it was their duty to ensure that the required maintenance of the embankment is done properly and in time.
- At Annexure 2, I have attached the daily Tatbandh samachar from the Executive Engineer of Bihar Water Resources Department at the Central Flood Control Room in Patna dated August 16, August 17 and August 18, 2008. The reports of the embankment news for August 16 and 17 are one liner: “All the embankments under the Water Resources Department are safe.” Then suddenly, the report on August 18, 2008, the report says that the embankment of about 400 m length between 12.1 and 12.9 km has been damaged and water is entering Nepal and area around Birpur. These three reports firstly shows that the flood control room of the WRD of Bihar was contradicting itself when they certified till Aug 17, 2008 that all embankments are safe and then suddenly saying on Aug 18 that the embankment has breached. Their reports were untruthful or they were plainly ill informed about the condition of the Kosi embankment. In either case, they should be held responsible for the breach. Secondly, the report of August 18, 2008 also said that the spurs along stretch of the embankment between 12.1 and 12.9 km were facing erosion for “the past many days”. If that was the situation, why did they not mention it in their previous reports? It claims that the local engineers were constantly involved in efforts to protect the embankment, that some anti social elements forced the laborers to flee from the site during the night of August 17 and hence there was excessive pressure on the embankment, that the materials sent for the flood protection on August 18 could not reach the site of work due to the Nepali people creating problems and the local administration not having been able to establish law and order. What this means is that the according to WRD, Govt. of Bihar, the breach occurred only because of the events after the night of August 17, 2008 and that everything was fine before that. This is completely wrong, if we see what we know was happening before August 17, is also clear from the Annexure 4 mentioned below. Thus, all the officials of the Bihar WRD from Chief Engineers down, at the location and also those at the Flood control Room at Patna should also be held accountable for the breach.
- At Annexure 3, I have attached an extract from one of the official documents (though we do not have the information as to which document this comes from, we know reliably that this is from official documents), that shows the comparison between what the field officers of Bihar WRD proposed for repair of the Eastern Kosi Afflux Bundh in Nepal, to be executed before the flood of 2008, and what the KHLC subcommittee approved and what the KHLC itself approved, for the portion of embankment at 12.1, 12.8 and 12.9 kms, the very portion that ultimately breached and which lead to the Kosi flood disaster. It is clear from this comparison that the field officers had recommended much higher quantum of repair work and this was progressively diluted by the KHLC subcommittee and than by KHLC. What this means is that the members of the KHLC subcommittee and the KHLC should be held accountable as to the reasons for this dilution and if this dilution was one of the factors that lead to the Kosi disasters.
- At Annexure 4, I have attached copies of the urgent communications from the Chief Engineer (Birpur), Water Resources Department of Bihar, to the Public Relations Officer of Bihar Govt in Katmandu (Nepal), dated August 9 and August 15 (this one also referred to the letter of August 14), 2008, requesting for cooperation in ensuring that in view of continued “massive” erosion of the Kosi eastern afflux bund at 12.9 km in Nepal, the work is going on “day and night”. This communication said that there is unnecessary delay from Nepal customs officials in Sunsari district and also the local organizations in Nepal are forcing the laborers to flee the place of work. The copies of these letters were also sent to the Executive Engineer in Flood Control Room of WRD in Patna, who in spite of all this, kept sending reports of all safe till August 17, 2008. These communications indicate that that indeed the massive erosion of the embankment at the breach location was known to the engineers of the Bihar WRD at the location of the embankments at least since August 8, if not earlier. And yet they were not taking urgent steps to ensure that this work is completed soon, and instead are sending such communications. Secondly, the officers who were recipient of these communications should also be held accountable to show what they did to amend the situation.
- At Annexure 5 I have attached abstract of some papers presented t the 1st India Disaster Management Congress, organised by the National Institute of Disaster Management (Govt of India) on 29-30 Nov, 2006 at Vigyan Bhawan, New Delhi. In a paper titled “Kosi-A Review of Flood Genesis and Attempts to Solve this Problem” by officials of Central Water Commission (CWC) AK Jha and DP Mathania (then posted at the Joint Project Office for the Kosi Project in Biratnagar, Nepal), it is stated, “But, this engineering approach has proved to be far too insufficient in its objectives as at present the pond of the barrage at Hanumannagar is almost full of sediments. Soon the embankments would be ineffective to control the Kosi floods. It would thus be naïve to embark upon finding of this menace through structural measures…”. This and other documents indicate that the officials in the government agencies at Patna and Delhi knew that the pond of the Kosi barrage was already full of sediments in 2006 and in fact much earlier. The question that needs to be posed to the officials at the CWC, Union Ministry of Water Resources, GFCC and Bihar WRD is, What had they done to address this problem and also what steps they had taken to ensure that this sedimentation does not lead to the disasters like the one Bihar witnessed in August 2008?
- In another paper shown at Annexure 5, by SK Sinha of WRD, Bihar, it is stated that construction of ponds and sinking of injection tubewells in the catchment area can help in flood management. The question that also needs to be asked of the officials agencies listed above, is what they have done to take up these measures on wide spread level? Why did they not take these measures to wide spread level on urgent basis? Which officials were responsible for this? Such officials in turn must also be held accountable since their inaction also contributed to the Kosi disaster of 2008. In fact as per another paper by SK Sinha and RR Prasad of WRD, Bihar, no less than the then President of India had, in a Chief Ministers’ conclave in Delhi on August 4, 2004, had recommended construction of layered wells as a step toward flood management in Bihar. Why were such measures not taken up on war footing and who are responsible for this?
- The officials of the government agencies listed above also needs to be asked as to what they have done with regard to the following issues which have significant bearing on the August 2008 Kosi disaster. The Indo Nepal Treaty of 1954, as amended subsequently had provision of soil conservation works. What has been done by the Govt of India to ensure that these have indeed been taken up at wide spread level all across the catchment areas in Kosi basin at regular intervals? The National Flood Commission (Rashtriya Barh Ayog) of GOI, also a number of other related committees and commissions had made a series of recommendations on the issue of flood management and embankment maintenance and their efficacy. What has been done by the Governments in India to ensure that these recommendations have been implemented? There had been breaches of embankments in the past in Bihar and elsewhere, including in Kosi basin. What has the Bihar and Govt of India done to ensure that accountability for such disasters in the past is fixed so that there is deterrence for future? Shri Dinesh Kumar Mishra, Barh Mukti Abhiyan and many others have been making detailed recommendations about ensuring that those affected due to the construction of embankments are justly compensated and proper accountability norms are fixed, and to ensure and that where necessary, the embankments be decommissioned and that credible, independent post facto evaluation of the embankments should be done. A case in point is the book by Shri Mishra, titled: “Trapped! Between the Devil and Deep Waters: The story of Bihar’s Kosi River”, published by SANDRP and PSI in September 2008. [We are sure the commission would have copies of this, if not, we can send if requested.] What has the governments done to ensure that such recommendations are implemented?
- Thus, among the persons who are clearly responsible for this mishap and who should be held accountable include:
Voices from the villages: Workshop notes organized by the Barh Mukti Abhiyan in 2008 to raise awareness about floods across North Bihar
Posted on 01 Mar, 2009 02:37 AMThe workshop notes are a record of the actual ground level experiences, understandings/misunderstandings and conversations regarding the floods in North Bihar.
The attached files below are the set of the workshop notes. We welcome comments which will passed back to Barh Mukti Abhiyan.
Overview of the 2008 Kosi flood situation from Samajik Shaikshanik Vikas Kendra
Posted on 02 Feb, 2009 09:01 PMThe following article is the latest update of an overview of Kosi floods by SSVK. It reveals the ineffective handling and inadequate supply of materials by the Government in the flood hit regions. It also points out the activities done by various organizations and SSVK itself.
First hand report on the Bihar flood zone 2008
Posted on 24 Jan, 2009 09:23 AMPriya Ranjan, recently visited the flood hit areas in Bihar recently and found that things were really sad and pathetic. Mushhar communities were surviving on snails and grass-seeds.
Should IMD give away meteorological data for free ?
Posted on 22 Jan, 2009 04:21 AMIndia Water Portal has a meteorological data tool (https://www.indiawaterportal.org/data/metdata) that gives rainfall data (and 10 other meteorological parameters) for each district of India for 100 years from 1901 to 2002. Over the past couple of years, many many people have expressed that they found this data useful and requested us to enhance it. The data on our meteorological data tool is from a research dataset put out by the Tyndall Center for Climate Change Research in the University of East Anglia, UK. The reason we got the data from them, is that IMD, India Meteorological Department, which is the chief source of official meteorological data in India, sells this data. To get the kind of all India data above, would be prohibitively expensive. Further, they would not allow this data to be made publicly available, as they sell the same.
GOONJ's urgent appeal to provide for winters in the the flood affected districts of Bihar
Posted on 17 Jan, 2009 02:08 PMThis year we certainly need much larger quantities due to extensive work going on in flood affected areas of Bihar & Orissa. We are thankful to a large number of organizations & individuals who whole-heartedly supported our campaign Rahat Floods.
Preliminary consolidated report on the effect of climate change on water resources, prepared by the Central Water Commission and the National Institute of Hydrology, under the guidance of the Ministry of Water Resources in 2008
Posted on 05 Jan, 2009 11:22 AMThe Preliminary Consolidated Report on the Effect of Climate Change on Water Resources, prepared by the Central Water Commission and the National Institute of Hydrology, under the guidance of the Ministry of Water Resources in 2008, is one of the first official reports made available by the Government of India, of a reliable quantitative assessment based on field data, of the likely effect of climate change on the availability of water resources, i.e. on the glaciers and snow melt, on rainfall and their effect on run off into the river system and their contribution to ground water. In the Report, an attempt has been made to give a brief account of the available studies on possible impacts of climate change on India's water resources, change in India's water needs, climate of India, river basins of the country, present water resources and future demand and supply, impacts of projected climate change and variability, and associated hydrological events and likely vulnerability of regional water resources to climate change. Identification of key risks, research needs and prioritisation of mitigation strategies has also been discussed. Access the report here: Preliminary Consolidated Report on the Effect of Climate Change on Water Resources
"Irrigation infrastructure - A view from below"
Posted on 27 Dec, 2008 03:52 AM"Irrigation Infrastructure - A View from below" is a new research study by Chitra Krishnan funded by the "Knowledge in Civil Society" initiative.
Audio files: Bihar floods - The survival story
Posted on 17 Dec, 2008 07:44 PMFollowing is the summary of an interview of Anshu after he along with his team did their part in the rehabilitation processes. The summary narrates Anshu's experiences and evaluations on Bihar flood.