Narmada

Compilation of data for Cauvery basin for river basin planning along with maps of major river basins of India
River basin planning allows observation of all relevant parameters in a basin in an integrated manner Posted on 17 Apr, 2009 09:49 AM

Water flows without regard to political and administrative boundaries. Water planning with respect to rivers should therefore be done for the river basin (or sub-basin) as a whole. River basin planning also has to look in an integrated way at all the relevant parameters like urban and rural populations, water usage patterns, water pollution, wastewater flows.

Oustees demand stoppage of Maheshwar dam in front of Environment Monitoring Committee
The oustees of Maheshwar Dam demanded immediate stoppage of Maheshwar dam in village during the visit of the Monitoring Committee constituted by the Ministry of Environment and Forest. Posted on 11 Mar, 2009 08:48 AM

The oustees of Maheshwar Dam demanded immediate stoppage of Maheshwar dam in village during the visit of the Monitoring Committee constituted by the Ministry of Environment and Forest. The oustees told the Committee that the project authorities have completely failed to rehabilitate the oustees but the construction work is going on full pace. Therefore, as per the conditions of the clearance the dam work should be stopped.

The Monitoring Committee: It may be stated that on 1st May 2001, the Ministry of Environment and Forest transferred the statutory clearance regarding Maheshwar Project to the Shree Maheshwar Hydel Power Corporation Limited (SMHPCL), the company building the dam. As per this clearance a Monitoring Committee was constituted to ensure that the rehabilitation work should be carried out at the same pace of concreting. The Committee headed by Mrs. Nirmala Buch visited the area on 23rd and 24th of February,2009.

×