Large Dams, barrages, reservoirs and canals

Dams have often been regarded as man’s response to nature’s vagaries, to mitigate flood and drought by containing water and releasing it as per demand and supply. Lately, dams are seen more as hydropower generators with flood mitigation, irrigation and drinking water supply only being additional benefits. This can be because of the increased acceptance that dams and canals, as awe inspiring as their structures might be, fail to deliver water to more than half of their commands. However, data and experience tell us that even the hydropower generation is also falling way below the promised numbers.

History and extent of dams in India

India’s first dam is the Kallanai built on the Cauvery river by King Karikalan of the Chola dynasty around 2,000 years ago. The dam, which is still functional and irrigates millions of acres, spans 329 m in length and 20 m in width. However, it was only post-independence that India’s love for big dams became more intense with the commissioning of a slew of projects including the Hirakud (1957), Gandhisagar (1960), Bhakra-Nangal (1963) and Nagarjuna Sagar (1967). Since then, the country has been continuously working on reining in its rivers for want of power, irrigation and domestic and industrial water supply needs. Almost half of the large dams in the country were built in the two decades of 1970-90. Maharashtra has the maximum number of large dams in the country (1845) followed by Madhya Pradesh (905) and Gujarat (666).

Map of major dams in India

A multi-purpose dam project includes one or more dams, infrastructure for generation of hydropower, infrastructure for housing of workers and for offices, a distribution network of canals and pipe systems, and access roads. All these have their individual and cumulative impacts on the river and the surrounding environment. Here also lies an opportunity to minimise the 'collateral damage' caused by dam projects by minimising the footprint of these adjuncts.

Dams as power generators

Hydropower is often billed as a renewable, economic and non-polluting source of energy and hence there is an increased emphasis on building dams especially in the hydrologically-rich but geologically-fragile Himalayan states. An assessment study put the hydroelectric power potential of the country at about 84,000 MW with maximum schemes envisaged on Brahmaputra basin (226) followed by Indus basin (190) and Ganga basin (142).

Possibility of revenue generation through sale of power units to other states and private players remains the main draw for state governments to invite project developers. However, reports suggest that poor financial conditions of discoms make it a poor proposition. Average generation per MW of hydro capacity in India in 2014-15 was over 20 per cent less than that in 1993-94.

Dams and canals for irrigation

Canal system of irrigation had been prevalent in India for centuries but it was the Ganga Canal that laid the foundation for large scale diversion of water to farms.

Number of dams in various statesThough the work was undertaken under the leadership of British Colonel Proby Cautley, it was the traditional acumen of local villagers that made the vast network possible. The canal was commissioned in 1855 irrigating around 5,000 villages. Today, the system irrigates nearly 9,000 km² of agricultural land in 10 districts of Uttar Pradesh and Uttarakhand.

The start of the Green Revolution in the mid 1960s put the spotlight on canal irrigation as the new hybrid crop varieties bred on heavy dose of chemical fertilizers and pesticides demanded assured irrigation. However, the increased investment and network expansion dealt little benefits. The World Commission on Dams in its year 2000 report found that the contribution of large dams to increased food grains production in India was less than 10 percent.

Loss in seepage, huge demand-supply gap, diversions under political pressures and comparatively easier and local availability of groundwater through pervasive use of borewells are the reasons for decline in efficiency trend.

Between 1996-97 and 2002-03, the area under canal irrigation declined by 2.4 million ha (13.8 per cent), the area under tank irrigation fell by 1.4 million ha (42.4 per cent), and the area irrigated by all other sources declined by 1 million ha (28 per cent). The only irrigation source that increased its share was groundwater wells, by 2.8 million ha (more than 9 per cent).

A study of 210 major and medium irrigation projects by SANDRP used the data supplied by the Ministry of Agriculture to show that after investing Rs 130,000 crore, these delivered 2.4 million ha less irrigation during 1990-1 to 2006-7. This means, the governments have to invest twice as fast in canal irrigation projects every year just to keep their command areas from shrinking

The study said that around Rs 1,00,000 crore was wasted in the name of improving irrigation. Feasibility studies were fudged in the case of most of the projects with huge investments, over-optimistic predictions were made and very little money was earmarked for basic maintenance such as desiltation. In some cases, political interests ensured that water was diverted to unviable areas at the cost of needier regions.

Dams and flood control

The efficiency of dams to withhold floods has always been put to question. Critics have also termed dams as harbinger of floods claiming that the essential scientific assessment for consistent release of water to avoid build up is rarely done.

Absence of a standard operating procedure for releasing water from the dam gates was evident in 2014 when 24 students picnicking in a river were swept away due to sudden release of water from Larji dam in Himachal Pradesh

Similarly, area downstream of Hirakud dam in Odisha has witnessed 14 floods in recent past with nine caused by sudden release of water from the dam. A major reason is that the dam has not changed its flood control strategy for 23 years while the rainfall pattern has undergone major changes in local areas. Lack of a coordination mechanism between neighbouring states about water flow also leads to emergency situations like one in 2011 when sudden release of water flow from upstream dams in Chhattisgarh led to breaching of danger mark in Hirakud.

In Gujarat, sudden release of large quantities of water from Ukai dam led to the biggest flood of 34 years in Tapi river submerging over 80 per cent of Surat, killing 150 persons and stranding over 20 lakh. Similar examples have been reported from other states.

Problem with 'training rivers'

Dams cause a disruption in the flow of a river by transforming it into a series of pools separated by dry stretches. The environmental impacts can be felt on the landscape, water resources, forest cover, and biodiversity. The Himalayas are almost equally distributed between zones 4 and 5. While a series of dams are being constructed in a seismically vulnerable and ecologically fragile zone, not only is optimisation of the planned development not considered, but the cumulative effects of the dams also are not considered. On a local level, blasting increases the possibility of landslides, and causes air and noise pollution. Quarrying on hill slopes and in the riverbed causes pollution and destabilisation of the slopes.

The large scale construction that is an inescapable part of hydropower development leads to deforestation. It has been observed that construction leads to the inadvertent loss of much more forest than has been accounted for. The presence of a dam on a river also impacts the ecosystem by bringing about a drastic change in the species composition. Invasive species tend to appear and flourish while suppressing endemic species and even causing some to become extinct. 

An affidavit filed by Ministry of Environment and Forest in the Supreme Court admitted the role of hydropower projects in Uttrakhand disaster in 2013. It said that “the maximum damage sites in the disaster affected areas (were) located either upstream or immediately downstream” from hydropower projects.

According to a paper by the United Nations Environment Programme, dams and their associated reservoirs permanently impact on freshwater biodiversity by several processes. Climate change has also been linked with dams. Studies show that large dams cause anoxic decomposition which leads to the formation of methane gas. This ‘greenhouse gas’ produced by dams may contribute to global warming to an appreciable extent. According to a study, dams contribute about 24 per cent of the total methane emissions in the world. Of these emissions, India contributes slightly under 28 per cent.

Submergence and displacement

Though the benefits of a dam are often exaggerated, the estimates related to land submergence and possible displacement of people are invariably kept low to paint a positive picture.

From Hirakud to Bhakra Nangal to Tehri and many more, scores of affected families were not rehabilitated at all. Those rehabilitated also complained about lack of livelihood opportunities and poor living conditions. Narmada Valley project, around which a big people's movement was built, remains the most controversial irrigation and hydropower plan. Envisaging around 30 irrigation and hydroelectric multipurpose dams, the project's environmental and social costs vis-a-vis the benefits have been cause of much debate and litigations. Sardar Sarovar dam, the largest structure on Narmada river, is believed to have displaced over 3 lakh families and is expected to displace additional 2.5 lakh families if its height is further increased by recently-approved 17 metre.

The World Commission on Dams in its report says: “While dams have delivered many benefits and made a significant contribution to human development, in too many cases the price paid to secure those benefits, especially in social and environmental terms, has been too high and, more importantly, could have been avoided.”

Political issues around dams

Shortage of water is increasingly being felt resulting in conflicts across the world. For the same reason India is facing disputes both within and outside its boundaries. While Punjab, Haryana and Rajasthan are fighting over water sharing from Bhakra Nangal, Kerala and Tamil Nadu went to court on diversion of water from Mullaperiyar dam.

On the other hand, Pakistan claimed that design of Baglihar project in Jammu and Kashmir violated the Indus Water Treaty whereas India is wary of China's plan to tame Brahmaputra waters through a series of dams. Similar are the concerns of Bangladesh which lies further downstream over India's attempt to build dams.

Way forward

It is evident that instead of focusing on building new dams, we need to attend to underperformance of existing projects. Decentralised solar, wind energy and small hydroelectricity projects with local communities as their managers as well as consumers can offer sustainable alternatives to big dams. This will not only mitigate ecological and social impacts of power generation but also reduce cost of power generation and distribution.

For irrigation purposes, revival of traditional community-managed networks like kuhls of Himachal Pradesh, phad irrigation of Maharashtra and recharging of underground aquifers through rainwater

The World Commission on Dams lists seven steps as a remedy to issues arising from dams. These include gaining wide public acceptance, exploration of alternatives to dams, optimal usage of existing structures, protection and restoration of ecosystems at river basin level, recognising entitlements of the affected people, compliance with applicable regulations and regional co-operation on trans-boundary rivers.

A few of the western countries, having realised the futility of large dams, are trying to help rivers reclaim their territory. Dams that no longer serve a useful purpose, are too expensive to maintain safely, or have harmful impacts are facing the axe especially in United States where the rate of decommissioning of large dams has overtaken the rate of construction since 1998.

The provision of adequate environmental flow releases from dams is an important means of achieving a compromise between overt exploitation of our rivers and a non-practical cessation of all use. Attempts have been made towards the assessment of these flows for the Ganga, and an ongoing project aims to achieve implementation of these flows in the Ramganga. The successful process of e-flows in India may indicate that it is going to be mainstreamed into water resource management policy.

 

Featured Articles
December 4, 2022 What is the status of inland fisheries in India? Read these situational analysis reports to know about inland fisheries, the life of the fisherfolk, governance and tenure in inland fisheries and threats to the sustainability of inland fisheries.
Fishing in an irrigation canal in Kerala (Image Source: Martin Pilkinton via Wikimedia Commons)
November 23, 2022 Inspite of the realisation that minimum flows are essential for rivers to maintain their health and biodiversity, water released from various dams in India continues to disregard minimum environmental flow requirements.
Cauvery river at Hogenakal, Karnataka. (Source: IWP Flickr Photos via Claire Arni and Oriole Henri)
March 25, 2022 Dammed and bound, will the beautiful river Teesta survive India's insatiable demand for electricity?
Heaven on earth: A view of the Teesta from the coronation bridge (Image Source: Paramanu Sarkar via Wikimedia Commons)
November 21, 2021 Upstream hydrological modifications altered the basin hydrology, says study
Kathiya Gaon, Tehri, Uttaranchal (Image: India Water Portal)
October 25, 2021 Will it be possible to achieve tradeoffs between meeting water needs of people and retaining river waters to sustain the rare and beautiful, but endangered Indus River Dolphin in the Beas river?
Beas river at Kullu, Himachal Pradesh (Image Source: Wikimedia Commons)
July 26, 2021 Do dams worsen floods? These videos by Jeevitnadi Living River Foundation highlight the role of dams in controlling floods and the emerging challenges to flood management in India.
Hirakud, India's oldest dam (Image source: India Water Portal on Flickr)
Transparency demanded in a letter to Jairam Ramesh on Polavaram Project - Himanshu Thakkar
An open letter to the Minister of Environment and Forestry demanding transparency in the Polavaram project undertaken by the government Posted on 04 Sep, 2010 10:43 AM

SANDRP logo

From:
Himanshu Thakkar
South Asia Network on Dams, Rivers & People,
c/o 86-D, AD block, Shalimar Bagh,
Delhi,

To: Shri Jairam Ramesh
Union Minister of State for Env and Forests (IC), New Delhi

Respected Sir,

I have just seen your letter dated Aug 18, 2010 to Orissa Chief Minister on the aboves subject, uploaded yesterday on MEF website.

  1. Your letter says that the Forest Clearance has been given to the Polavaram Project on July 28, 2010 is subject to the condition, "... no submergence and displacement of people including STs take place in Orissa and Chhattisgarh...". However, this condition is in complete contradiction with the environment clearance given by your ministry on Oct 25, 2005, which says in para 2, "Total 1,93,35 persons are likely to be affected by this project, out of that 1,75,275 persons in Andhra Pradesh and 6,316 persons from Orissa and 11,766 are from Chattisgarh." It is clear the condition of no submergence and displacement on Orissa and Chhattisgarh, stated in your letter, in the Tribal Development Ministry's condition, and in the forest clearance letter is in complete contradiction with the environment clearance given by you. One of them have to be cancelled due to this contradiction, we would like to know, which one would be cancelled.
Babhli water conflict: Less water, more politics - EPW article
The growing conflicts over water sharing between states in India Posted on 01 Sep, 2010 02:13 PM

Babhali Barrage

This paper published in the Economic and Political Weekly highlights the recently growing conflicts over water sharing between states in India and argues that the intensity and periodicity of these conflicts are increasing and that these conflicts are expected to get worse with the increasing uncertainty of rainfall and water availability. The document goes on to describe the latest one in the news, the conflict between Maharashtra and Andhra Pradesh over the Babhli barrage.

Dr G.D. Agrawal s tapasya - Achieved the desired result
Dr. Aggarwal's tryst to let Bhagirathi flow its natural course succeds Posted on 30 Aug, 2010 12:47 PM

Dr G.D. Agrawal’s tapasya, his third fast-unto-death, has finally achieved the desired result.  Since 2008, Dr Agrawal has been trying to persuade the Government of Uttarakhand and the Government of India that R. (Bhagirathi) Ganga must be allowed to flow in its natural state in the uppermost reach between Gangotri and Uttarkashi.  The two governments had plans to construct three new large hydropower projects in this stretch.  Dr Agrawal’s fasts have led to the scrapping of all the three projects.

Movie reviews from 'Voices from the Waters 2010' film festival held in Bangalore
Reviews from the 5th edition of the Voices from the Waters, the international film festival on water held in Bangalore from August 27th to 30th, 2010
Posted on 28 Aug, 2010 08:58 AM

Voices from the Water 2010

Reviews of some of the movies screened -

“Be water, My friend”

This UNESCO funded film, “Be water, My friend” tracks the research of Professor Gordon Lightgoot, an expert on ancient water monuments as he tries to understand and rectify the alarming drying up of Karez’s in northern Iragi region of Kurdistan.

Groundwater externalities of surface irrigation transfers under national river linking project: Polavaram – Vijayawada link
Understanding the Polavaram project on the Godavari Posted on 25 Aug, 2010 05:00 PM

Polavaram projectThis document published by IWMI and CGIAR describes the details of the Polavaram project, which has been planned by the state of Andhra Pradesh as a multi-purpose project:

  • to provide irrigation benefits to the upland areas
  • to provide a water supply to the industries in Visakhapatnam city, including the Steel Plant, for the generation of hydropower
  • for the development of navigation and recreation facilities.

The project envisages the construction of an earth-cum-rock filled dam that is 1,600 m long across the Godavari River at Polavaram, and about 42 km upstream of the Godavari Barrage at Dowlaiswaram.

Dams and development: A new framework for decision-making - A World Commission on Dams report
The big fight: Are dams a necessity of urbanisation? Or, Are they destroyers of Natural resourse? Posted on 15 Aug, 2010 01:51 PM

This report by the World Commission on Dams begins by arguing that the debate about dams is a much broader issue and is important for everyone since it is a debate about the very meaning, purpose and pathways for achieving development. It is complex because the issues are not confined to the design, construction and operation of dams themselves, but include a range of social, environmental and political choices that define development.

Dams fundamentally alter rivers and the use of a natural resource, frequently entailing a reallocation of benefits from local riparian users to new groups of beneficiaries at a regional or national level. At the heart of the dams debate are fundamental issues of equity, governance, justice and power. The report argues that the main challenge lies in reconciling the competing needs between different groups of actors and provides a framework to deal with these fundamental issues in the dam debate.

National Hydroelectric Power Corporation: People don't matter - A dossier by Urgewald
A brief overview on the role of India's premier dam building agency, the National Hydroelectric Power Corporation, as the aggressive business player expanding its business, i.e. dams in the country. Posted on 11 Aug, 2010 01:24 PM

This document by Urgewald provides a brief overview on the role of India's premier dam building agency, the National Hydroelectric Power Corporation (NHPC) in the construction of dams in India and is highly critical of the mode in which the NHPC has been aggressively expanding its operations of building dams across rivers in the country. 

It aims to inform the public, investors and financiers about NHPC’s track record and expansion plans and presents compiled information from three regions where NHPC has been actively involved in the construction of dams namely:

  • Narmada Valley in Central India
  • Sikkim and Arunachal Pradesh in Northeastern India
  • The lands of the Kuki people in Northwestern Burma, where NHPC is building a dam for the military junta.

A preliminary ecosystem services assessment of likely outcomes of the proposed Pancheshwar dam in India/Nepal - An IES report (2010)
Pancheshwar dam will be the world's second tallest structure intended to harness hydroelectric power Posted on 02 Aug, 2010 02:24 AM

A preliminary ecosystem services assessment of likely outcomes of the proposed Pancheshwar dam in India/Nepal - An IES reportThis report by the IES presents the findings of a study that explores the likely impacts of the recent proposals in India to build a dam at Pancheshwar in the Himalayas on the river ecosystems and the surrounding areas and people involved. This dam will be the world's second tallest structure intended to harness hydroelectric power and water by controlling the flow of the Kali river and its tributaries.

The document argues that although there are many benefits of the dam in terms of energy and water, the wider ramifications of the dam and its consequences for the people staying around the area have not been thought about in the planning process. The planning process has not engaged local people in the decision-making process, there is paucity of published information and the environmental and social consequences have been considered belatedly in the planning process.

×