Bhagirathi

After Phailin, Cyclone Helen hits Andhra Pradesh coast
News this week: Cyclone Helen devastates Andhra coast, built up area in the capital replaces green spaces and packaged water unit to come up near Sambhar lake. Posted on 24 Nov, 2013 02:42 PM

 After Phailin, Helen devastates Andhra coast 

Cyclone Helen hit Andhra coast Source: Wikimedia
Water quality of the Bhagirathi, Ganga in the Himalayan region: A study by NEERI
This study of the water quality of the Ganga was commissioned after the construction of the Tehri Dam. It acknowledges that most people in India have a belief that water from the Ganga has bactericidal properties and this might be affected by the dam. National Environmental Engineering Research Institute (NEERI) was retained by the Tehri Hydro Development Corporation Limited (THDC) to investigate any impact that the Tehri Dam might have on the water quality of the Ganga. This report presents the results of that investigation. Posted on 19 May, 2012 05:00 PM


View of the Bhagirathi near Dharali, seen as a valley bound by snowy peaksThe Bhagirathi in its upper reaches, here seen near Dharali (Photo: Chicu Lokgariwar)

Impacts of climate change on growth and yield of rice and wheat in the Upper Ganga Basin – A study by Indian Agricultural Research Institute
This study by Indian Agricultural Research Institute (IARI), commissioned by WWF-India focuses on the impacts of climate change on the rice and wheat production system in the Upper Ganga Basin. Posted on 26 Jun, 2011 01:51 PM

CoverThis report presents the results based on climate change scenarios and identifies potential adaptation strategies. The study is part of the ‘Climate Change Impacts on Freshwater Ecosystems in the Himalayas’ (CCIFEH) project, a joint initiative of WWF-India and WWF-Nepal, supported by WWF-Netherlands and aims to study and understand climate change impacts on freshwater ecosystems, livelihoods and the economy.

Change in climate conditions and the frequency of natural disasters in recent times has made it imperative to find lasting adaptation solutions for the agriculture sector. Given that almost 60 per cent of the country’s population relies on this sector for its livelihood and that it contributes approximately 15.7 per cent of India’s GDP, an analysis of changes which could impact crop yields and subsequently lead to an instable food security scenario is necessary.

Dr G.D. Agrawal s tapasya - Achieved the desired result
Dr. Aggarwal's tryst to let Bhagirathi flow its natural course succeds Posted on 30 Aug, 2010 12:47 PM

Dr G.D. Agrawal’s tapasya, his third fast-unto-death, has finally achieved the desired result.  Since 2008, Dr Agrawal has been trying to persuade the Government of Uttarakhand and the Government of India that R. (Bhagirathi) Ganga must be allowed to flow in its natural state in the uppermost reach between Gangotri and Uttarkashi.  The two governments had plans to construct three new large hydropower projects in this stretch.  Dr Agrawal’s fasts have led to the scrapping of all the three projects.

Dr. GD Agarwal's fast to resume
A press release on Dr. GD Agarwal's resuming his fast Posted on 09 Jul, 2009 01:57 AM

 

  1. The state government of Uttarakhand promised immediate suspension of all works on the two projects Bhairoghati and Pala-Maneri in its letter of 19th June, 2008 and expressed its full commitment for conservation of River Bhagirathi in its natural form ‘from Gangotri to Uttarakashi’. However construction work on the projects (particularly on Pala Maneri project) leading to destroy Gangaji is going on in full swing. The above makes all assurances to us and to Maa Gangaji look as mere jokes.
  2. The Government of India committed immediate stoppage of all work on its project Loharinag-Pala in its letter on 19th February, 2009. But the construction work on the site has gone on un-stopped and on an accelerated speed. This again is an act of cruel deceipt.
Stay on suspension of Loharinag project!
Stay of the Central Government decision to suspend Lohari Nag , Pala (600MW) power project by Nainital High Court- a blow to the Environment and People of Uttarakhand Posted on 13 Mar, 2009 01:29 AM

It is with great disappointment that Raksha Sutra and Uttarakhand Nadi Bachao Andolan received the news from the report in Amar Ujala, Dehradun 27.02.09 that the Uttarakhand High Court has granted a stay to the Central Government Order suspending the work on the Loharinag , Pala (600 MW) hydroelectric project. The work on the project has begun with hardly a break in its stride. The Public Interest Petition filed by Rural Litigation and Entitlement Centre, a Dehradun based NGO filed for a stay stating that neither would the natural flow of the river be affected nor is the project causing any environmental damage is a total falsehood. The petitioners have deliberately misled the High Court. They have not visited the site for themselves and have filed for a stay from the sanitised environment of Dehradun. We who live and work in Uttarkashi know the truth. This is not the first instance that this NGO has taken legal action to restart projects that have been stopped because of their dubious benefits. It is quite clear that unlike its name this NGO is working not for rural entitlement but rather for the entitlement of vested interests. This is very saddening. The environmental impact of the project is enormous. Entire mountainsides have been scarred and shorn of their green cover. Thousands of tonnes of excavated rock from the tunnel construction have been dumped on the riverside and threaten to block the flow of the river with the onset of monsoon. The dust being churned day and night by the hundreds of dumpers and trucks operating on the project is choking all life on both sides of the river. Fields that were the mainstay of the primarily agricultural community are lying barren because no growth has taken place for the last 3 years despite the best efforts of the farmers. Pastures which sustained the livestock of the village people have been devastated. Representations by the people to the government and NTPC have yielded no satisfactory results. We have photographic and video evidence of this.

Captive Ganga : Tunnels in Uttarkashi : Article in FrontLine
Captive Ganga : Tunnels in Uttarkashi : Article in FrontLine Posted on 12 Mar, 2009 11:56 AM

Protesting broken promises: Dr. G.D. Agrawal resumes fast-unto-death
Updates on Dr. G.D Agrawal's fast Posted on 20 Jan, 2009 12:19 PM


G.D. Agarwal

Images of a dying river, handwritten Press releases & more: Images of a Struggle on Flickr Charging the Government of India with not keeping its solemn commitment to keep the River Bhagirathi alive in its pristine stretch from Gangotri to Uttarkashi, Dr. G.D. Agrawal has resumed his fast-unto-death from Makar Sankranti Day, Wednesday, Jan 14, 2009.

You may recall that Prof. G. D Agrawal, former Professor & Dean of Students at IIT-Kanpur, the first Member-Secretary of India's Central PollutionControl Board and one of India's foremost environmental scientists went on a fast from June 13, 2008 to seek uninterrupted flow of River Bhagirathi (Ganga) in its natural form between Gangotri and Uttarkashi. His demand was very limited & specific, i.e., that the River Ganga be allowed to flow in its natural form in this 125 km stretch from its origin. This is the only stretch left now where the Ganga can still be seen in its pristine form. Dr. Agrawal requested the Govt. of India & the State Govt. of Uttarakhand to stop construction of Hydro Electric Projects (HEPs) in this stretch so that river flow was not diverted through tunnels that would destroy its ecology and its unique self-purifying properties. (diagrams are provided in the attached press release). Indians across the world got sensitized and lent their support to Prof Agrawal. Many wrote or met the PM of India and the CM of Uttarakhand and requested them to protect the Holy Ganga , whom Pandit Jawaharlal Nehru described as India's civilizational identity.

High Level Expert Group on the Bhagirathi river lacks required expertise
High Level Expert Group on the Bhagirathi river lacks required expertise Posted on 28 Aug, 2008 10:05 PM

All is not well with the High Level Expert Group (HLEG) constituted on an order of the Government of India to determine the flow required to keep the Bhagirathi river 'alive and to ensure perennial environmental flow in the river'. It may be recalled that on June 30, 2008 the Government of India committed itself to "suitably ensure perennial environmental flow in all stretches of river Bhagirathi."This commitment was made in response to a representation of the Alumini Association of IIT- Kanpur to the Prime Minister of India requesting his intervention in the fast-unto-death undertaken by Dr. G.D. Agrawal , a former Dean of IIT-Kanpur -- to ensure the natural and uninterrupted flow of the Bhagirathi river between Gangotri and Dharasu (Uttarkashi). Subsequently the Ministry of Power, GoI, directed Shri R.S. Sharma, Chairman & Managing Director of NTPC, to constitute a high level expert group. The biggest problem with the HLEG is that it lacks the necessary scientific expertise to comprehensively address the issue. In a letter to Shri R.S. Sharma, rejecting his invitation to be a member of the HLEG, Dr G.D. Agrawal wrote, "Several members of the HLEG as constituted (including its Chairman) fall extremely short on any sort of expertise on river ecology and environmental flows...The commitment of most proposed members towards conservation of Bhagirathi Gangaji as the mother of India's faith, unity and culture is also questionable and I cannot afford to provide credibility to its deliberations and conclusions by being an ordinary member of the group."

Prof.G. D. Agrawal's satyagraha against the construction of dams on the Bhagirathi River
Prof.G. D. Agrawal's satyagraha against the construction of dams on the Bhagirathi River Posted on 17 May, 2008 09:08 AM


Pained by the unrelenting destruction of the Ganga river, especially by a series of dams in its upper reaches, Dr G.D. Agrawal, India's pre-eminent environmental quality scientist and a legendary Professor (and HoD) of Civil & Environmental Engineering at IIT-Kanpur. (Access:Biography Sketch Here) has decided to go on a fast-unto-death to oppose its continuing desecration. His conviction that we are staring at an unprecedented ecological and cultural catastrophe comes from his powerfully logical mind. Critique on proposed dams on Bhagirathi River. Access here: Critique on Dams

×