Muzaffarnagar District
Pond water reuse from a circular economy perspective
Posted on 24 May, 2022 08:06 PMPonds are increasingly getting polluted mainly due to the discharge of wastewater from residential areas, sewage outlets, solid waste dump sites, livestock rearing sites (e.g., dairy, poultry), and fertilizers and pesticides from farmers’ fields.
Clean Kali: All eyes now on government
Posted on 03 Jun, 2017 07:58 AMRampura, situated in Bulandshahr district in western Uttar Pradesh, is one of the 1,200 villages on the banks of the 300-km long East Kali, a tributary of the Ganges. The river is named after goddess Kali who, according to the Hindu mythology, is fierce and fights evil by ingesting it.
Water not for profit
Posted on 16 Oct, 2016 08:58 PMIn August 2016, the Karnataka government gave Abu Dhabi-based businessman B.R. Shetty permission to privatise the iconic Jog Falls to make it a perennial waterfall and to develop it into a tourism hotspot.
Groundwater flow modelling and aquifer vulnerability assessment in Yamuna–Krishni sub-basin of Muzaffarnagar district – A study by Central Ground Water Board and Aligarh Muslim University
Posted on 02 Feb, 2011 08:24 AMThis report by Aligarh Muslim University and Central Ground Water Board (CGWB) deals with groundwater flow modelling and aquifer vulnerability assessment in Yamuna–Krishni sub-basin of Muzaffarnagar district. For evaluation of the groundwater resources and for minimizing the error of estimation, the system has been evaluated through aquifer modelling where water balance is established using partial differential equation of groundwater flow and is solved with boundary and initial boundary conditions.
Dr. GD Agarwal's fast to resume
Posted on 09 Jul, 2009 01:57 AM
- The state government of Uttarakhand promised immediate suspension of all works on the two projects Bhairoghati and Pala-Maneri in its letter of 19th June, 2008 and expressed its full commitment for conservation of River Bhagirathi in its natural form ‘from Gangotri to Uttarakashi’. However construction work on the projects (particularly on Pala Maneri project) leading to destroy Gangaji is going on in full swing. The above makes all assurances to us and to Maa Gangaji look as mere jokes.
- The Government of India committed immediate stoppage of all work on its project Loharinag-Pala in its letter on 19th February, 2009. But the construction work on the site has gone on un-stopped and on an accelerated speed. This again is an act of cruel deceipt.