Questions regarding MBBR sewage treatment plant design

Dear Sir./ Madam,

We are providing MBBR plants to our Industrial client thorugh MBBR plant manufacturers. I like to know the difference in design for MBBR Sewage Treatment Plant if:-

a) There is single shift of 150 persons and three shifts of 150 persons in each shift.

b) If a plant is designed for single shift of 150 persons, how much is the safety factor ie load it can take in terms of time span and flow. (For location at Neemrana, Rajasthan)

c) If the flow of 8hrs is treated in 24 hrs, what if the same flow of 24 hrs to be treated in 24 hrs. 

d) What is the time span for treatment in equilasation tank, MBBR and clarifier.

×