I run a hostel in Bangalore at Kengeri ,our bore depth is 350ft, we had let the 2hp 25stage .
We had water from 2004to 2010 ,this year 2011 as summer is approaching we are facing problems.
There is a lot of silt probably due to the city drinage which flows 300ft away.
i have got the bore washed and increased the pump depth from 250ft to 280ft.
I still get good water for 10 mins only,if we switch off the bore well for 2hours we get another 10mins of water.
please suggest or guide as whats o be done.