Boring was completed upto 300 ft in the suburbs of Patna, Bihar but due to local prob. the lowering could not be done.
3-4 days has past, the sidewalls is suspected to be collapsed.
My question :
Is it possible now to start the lowering of pipes
Boring was completed upto 300 ft in the suburbs of Patna, Bihar but due to local prob. the lowering could not be done.
3-4 days has past, the sidewalls is suspected to be collapsed.
My question :
Is it possible now to start the lowering of pipes