Mark 1 model ready for launch 1984
Trials in Pai river northern Thailand 1986
Linear turbine ready for trials in Pai river northern Thailand 1986
Drawing page 3
Drawing page 2
Open Channel Flow Linear Turbine
River flow Linear turbine
Post By: John Service