Guidelines for preparation of detailed project report for rural piped water supply schemes A document by Ministry of Drinking Water and Sanitation 2012

This document by Ministry of Drinking Water and Sanitation provides essential components that should form part of detailed project report in village/multi village’s rural piped water supply scheme.

The main components of the guidelines include

  1. Location
  2. Project execution and design period
  3. Population
  4. Water demand
  5. Present status of water supply and sanitation
  6. Institutional set up and details of formation of VWSC
  7. Details of preparation of village water security plan
  8. Proposed scheme-details of scheme components
  9. Cost estimates
  10. Life-cycle cost approach
  11. Operation and maintenance
  12. Water quality monitoring
  13. IEC and HRD activities
  14. Other design norms and practices
  15. Scheme completion schedule
  16. Completion reports
  17. Approval of projects

Click below to download the guidelines.

Post By: iwpsuperadmin
×